Dam Construction at Leonard’s Mill – 7, Finished?
The sandbags have been removed and the heavy equipment is gone. There is water flowing over the rock weir and through the new crib on its way to the Penobscot River. The top of the rock weir is approximately 125.6 ft. above sea level. It should hold back water in Chemo Pond to the same […]